Goldcorp Inc. Red Lake Mine - Design & Commissioning

G. Ritson, Chief Metallurgist, Hatch Associates Ltd.
R.Tyreman, Process Metallugist, Goldcorp Inc.

July 26th, 2001

The Red Lake Mine is situated in Bahner Township, Red Lake area in northwestern Ontario. It is an underground mine that has been in production since 1948. The property was originally known as the Dickensen Mine and was shut down in 1996.

A feasibility study was carried out in 1998 and it was determined that a new mill should be constructed with a throughput rate of 600 stpd. The life-of- mine average gold grade was projected to be 1.35 oz/t with gold predominantly associated with arsenopyrite and pyrite.

Metallurgical testwork indicated that the optimal flowsheet for gold recovery would include an autoclave for oxidation with a carbon circuit for adsorption. To limit capital cost and establish cashflow, the mill was constructed without an autoclave. The recovery by gravity and cyanidation was projected to be 83%. A flotation plant was constructed at the tail end of the circuit to recover the additional gold associated with sulphides from the leach circuit tailings. This material is being stockpiled onsite for future oxidation treatment.

Detailed engineering was started in early 1999 and the first gold was poured in August 2000. One feature of the project was the use of Contact Lake equipment from Cameco’s Contact Lake project. The entire mill was purchased and equipment re- used where possible. The capital cost for the process facilities was C$3 1.5 million.

Download the full report here.

  Goldcorp Inc., Red Lake Mine Design and Commissioning
369kb| 18 page Acrobat Info Sheet


Related links

 

The above is an Adobe Acrobat file. If you require more information or need to download the free plug-in, click here for more details.

 

Want more technical papers/presentations and emailed directly to your inbox? As well as an open discussion forum to post a comment, ask a technical question, solicit and idea or gain industry feedback on the issues presented in the technical paper/presentation? Subscribe to the special 25th anniversary monthly "e-Workshop" today.  

Share Your Knelson Experience
"We have a XD48 concentrator on site which is helping in our throughput though we started using Knelson concentrators in 1993, the product has improved over the years and we will not have been where we are now without it and it will get better and better with the years." - Maureen Mensah, Purchasing Officer - Ashanti-Iduapriem Mine, Ghana ...more > >